Highway 400 Employment Area Secondary Plan
Background Reports
Some of the following resources (PDF files) require the Adobe Acrobat Reader; click here to download it if you are without this software.
If you are having difficulty downloading any of these files, please contact the Town of Bradford West Gwillimbury. The Town will have a CD forwarded to you.Town of Bradford West Gwillimbury,
P.O. Box 160,
3541 Line 1,
Bradford, ON
L3Z 2A8,
attention Ms. Lorraine Wauchaupe,
or by email: lwauchope@townofbwg.com
Towards a Secondary Plan for the Highway 400 Employment Area - A Planning Assessment, Sorensen Gravely Lowes Planning Associates Inc., June 2006
- Report (Not including Section 5.8 Urban Design Considerations)
- Section 5.8 - Urban Development Considerations
- Figure 1 - Schedule
- Figure 2 - Study Area & Preferred Settlement Area
- Figure 3 - Proposed Land Use and Circulation Concept Plan
- Figure 4a - Natural Features
- Figure 4b - Man Made Features
- Figure 5 - Initial Proposed Land Use
- Figure 6 - Significant Features And Set Backs
- Figure 7 - Existing Floodplains
- Figure 8 - Proposed Floodplain
- Figure 9 - Wastewater Servicing Concept for 400 Study Area
- Figure 10 - Existing & Planned Water System Upgrades
- Figure 11 - Deleted
- Figure 12 - Location of Study Areas
Background Report: Employment Land Needs Analysis: 400/88 Study Area, Clayton Research Associates Ltd., urbanMetrics inc., August 2006
Highway 400/88 Employment Lands and Bond Head Settlement Area Functional Servicing Report, Stantec Consulting Ltd., Beacon Environmental, July, 2006
- Executive Summary
- Executive Summary
- Figure 1 - Overall Plan
- Figure 2 - Option C
- Figure 3 - Existing Floodplan
- Figure 4 - Land Use & Circulation
- Figure 5 - Proposed Floodplain
- Figure 6 - Proposed SWM
- Figure 7 - Wastewater Servicing Concept
- Figure 8 - Proposed Wastewater Servicing Plan
- Figure 9 - Water System Upgrades
- Figure 10 - Proposed Water System Plan
- Stormwater Management and Floodplain Management
- SWM Report
- Figure 1 - Overall Plan
- Figure 2 - Land Use and Circulation
- Figure 3 - Study Area
- Figure 4 - Control Nodes
- Figure 5 - Prelim SWM
- Figure 6 - Incremental Cut and Fill Balance NS3
- Figure 7 - Incremental Cut and Fill Balance NS4
- Drawing 1 - Overall Drainage Plan
- Drawing 2 - Crossing Data and Photos
- Drawing 3 - Floodplain Mapping
- Drawing 4 - Channel Realignment Exisiting
- Drawing 5 - Channel Realignment Proposed
- Drawing 6 - Cut and Fill Balance
- Appendices
- Wastewater Report
- Wastewater Report
- Figure 1 - Overall Plan
- Figure 2 - Land Use and Circulation
- Figure 3 - Treatment Alternatives
- Figure 4 - Aerial of WPCP
- Figure 5 - Site Layout WPCP
- Figure 6 - Servicing Concept
- Figure 7 - Proposed Servicing
- Figure 8 - WPCP Proposed Site Layout
- Figure 9 - Process Flow
- Wastewater Appendices
- Water Supply and Distribution
- Water Report
- Figure 1 - Overall Plan
- Figure 2 - Land Use and Circulation
- Figure 3 - Demand Balance
- Figure 4 - Aerial WTP
- Figure 5 - Treatment Alternatives
- Figure 6 - Existing Watermain Plan
- Figure 7 - Existing and Planned Upgrades
- Figure 8 - Proposed Plan
- Figure 9 - Process Flow of LWTP Expansion
- Figure 10 - WTP Projections
- Figure 11 - Preferred Treatment Alternative
- Water Appendices
Highway 400/88 Environmental Impact Statement, Beacon Environmental, July 2006
- Front Cover and Table of Contents
- Environmental Impact Statement
- Appendix A - Figure 1
- Appendix A - Figure 2
- Appendix B
- Appendix C
- Appendix C - Figure 1 - Water Balance
- Figure 1 - Site Location
- Figure 2 - Geology
- Figure 3 - Vegetation Communities
- Figure 4 - Natural Features
Background Agricultural Report for Highway 400/88 Secondary Plan, Stantec Consulting, July 2006








